
UK Onshore Wind Conference 2025 Review
Edinburgh 16-17th September 2025 Political Landscape I was unsure what to expect from the first British wind conference I have attended since the new Labour...
Read More ⟶Edinburgh 16-17th September 2025 Political Landscape I was unsure what to expect from the first British wind conference I have attended since the new Labour...
Read More ⟶Problem Vattenfall UK operates Swinford Wind Farm, 11 x V90-2MW in rural Leicestershire. The site is operated by a small, dedicated team and uses a...
Read More ⟶As part of 2025’s drive to support Mental Health Charities Windy Production’s is proud to Support Jordon Roney who is running an Ultra Marathon through...
Read More ⟶Changing out your wind turbine controller for a new one isn’t for everyone. There’s a case for if it ain’t broken don’t fix it and...
Read More ⟶The GE1.5 wind turbine was a large part of my early career in reliability engineering. In the mid-2000s, GE took advantage of their strong domestic...
Read More ⟶It’s on a need to know basis and… Remembering the state of the wind operations and maintenance (O&M) market in 2013, Enercon wind turbines were...
Read More ⟶This coming March, join us in the pavilion at Strathallan Wind Farm to look under the bonnet of an Enercon E-70 refurbished and installed by...
Read More ⟶Preview: Chapter 7 Up-tower Downunder (05:29) Ausssie techs BBQ up-tower tell a wind turbine poo story: Preview: Chapter 7 Up-tower Downunder (05:29) Hotly requested by...
Read More ⟶The newly-elected Labour government – as part of its plans to transform the UK into a ‘clean energy superpower’ – wants to drastically expand renewables...
Read More ⟶CMS for Wind Turbines After working over a decade in wind CMS, I’ve tried to condense my wind turbine knowledge into one introductory article, exploring...
Read More ⟶